Showing posts with label Funding. Show all posts
Showing posts with label Funding. Show all posts

11 May 2026

Bus After Midnight, Pt. I: the last bus of the day

Every day at midnight, transit service stops for the night, only to resume the next morning. Shutting down a transit service is more complex than it seems though, and an examination of late night service on OC Transpo reveals some patterns that are difficult to spot during the more complex daytime service. 


Evening service levels are lower than other periods for good reason. This period sees lower travel demand, and agencies schedule more service during the day when it can serve the most passengers and needs a lower subsidy, such as that seen in the TTC chart below. 

Note: while OC Transpo runs with a greater subsidy on most routes, there is no reason to believe that this pattern is different - ridership figures show lower passenger counts in the evening. 
A TTC graphic showing higher subsidy for transit service in the evenings
A chart from the Transport Trends Report showing higher demand at peak than midday, and higher demand at midday than evenings



But this is not a reason to abandon sensible late night network planning. As the chart above demonstrates, even in 2022, evening ridership was lower than it was at the peak of OC Transpo ridership in 2011. Night service often serves low income residents - service workers finshing work at the city's stores and restaurants, students returning home after late classes, and shift workers working late shifts. Additionally, many people 
occasionally ride late night service, and the availability of service may induce them to keep riding transit instead of switching to driving. 


This is the first of a two part series. This post will examine late night connections, especially last trips and Line 1 headways. The second post will look at the overnight bus network, focusing on coverage, scheduling quirks, and connections at Rideau Station. This will be more speculative than my usual, with some crayons in each part. 


16 November 2025

Budget Holes and Money Pits

The draft 2026 budget has finally been released, after Mayor Mark Sutcliffe bragged about it being the most transparent budget in the history of the city. It's true - hot air is transparent, and it creates mirages of fiscal responsibility and responsible governance. 

The mayor's press statements brag about fiscal responsibility and transparency, but the transit budget stands in opposition to his empty claims. Among the misleading or inaccurate statements are a third  "one-time" expectation for $47 million of "required" funding from upper levels of government which has never materialized ever; fare revenue increases bordering on magical; and the hiding of OC Transpo's subsidy behind the aforementioned false numbers and misleading budgeting. 

With this budget, the total operating cost reaches $939 million in 2026. Despite this, there is zero attempt to reorganize scheduling, a pathetic attempt at transit priority measures, and little attempt at financial transparency, which creates true image of fiscal indulgence and a lack of regard for long-term planning. 

OC Transpo will require even more money over the coming few years. Overprojecting revenue has become an annual ritual at City Hall - with a hostile mayoralty or province in charge, transit runs the risk of becoming a target. 

 

The City must right the fiscal ship, come clean about the looming danger, and City Council be resolute in demanding that this be done with the utmost transparency and accountability. 

Upper Governmental Funding at OC Transpo: $39 million expected in 2023 not funded; $36 million expected in 2025 not funded; we're expecting $47 million again?

22 September 2025

Transit Committee - 11 September, 2025

Introduction

On 11 September, 2025, Transit Committee met for its fifth meeting this year. The meeting video can be found at this link

Reliability continues to be the big issue facing OC Transpo. This meeting, councillors discussed reliability problems, the electric bus program and fleet assignments, and funding splits for transit priority projects, among other topics. However, while councillors talk a good game about supporting public transit, many have a track record of opposing programs which would improve reliability. In this context, empty words only calls to mind broken promises, not that of a more transit-oriented future. 

Much of the discussion was triggered by a staff report on reliability, whose contents were discussed at the meeting and are in this article. I will write a response to the report itself in a separate article. This meeting also included a Stage 2 update, which will be separate as usual. 


This is the first meeting after Renee Amilcar's departure from OC Transpo. Troy Charter, the director of rail operations, has become acting general manager pending a search for a permanent figure. 


Documents archive, all in PDF format: 


08 May 2025

Funding OC Transpo

Introduction

It is orthodoxy in Ottawa's transit advocacy circles that OC Transpo is underfunded. Advocacy groups from Ottawa Transit Riders and Strong Towns Ottawa to Free Transit Ottawa and Horizon Ottawa use phrases  like "underfund", "properly fund", and "neglected to fund" to describe OC Transpo. This extends to some politicians, including mayoral candidate and current MPP Catherine McKenney, who said that OC Transpo has suffered from "years of underfunding," as well as the media, who describe OC Transpo's various budget crises which these days seem to be the most regularly scheduled event at OC Transpo (these are not the same as "underfunding") - see this year's $56 million in "fake money" from bogus ridership projections and phantom spending by other levels of government. I have no doubt we will have another budget crisis sometime this year. 

Independent of these regularly occurring crises, which incidentally would make a great investigative journalism piece for someone with lots of connections to staff at City Hall, the mayor and City Council have so far resisted the urge make drastic increases to the budget, though many may disagree. (11.4% is a large increase, but the 4% increase that comes from real money is much smaller.) 

11 February 2025

Upper Government Funding: No Replacement for a Responsible Municipal Government

Introduction

With two elections this year, Ottawa has received very good news on two fronts. First, on the 27th of January, the federal government announced $18 million a year to go towards OC Transpo's capital expenses. Then, on the 4th of February, the provincial Progressive Conservatives and Liberal both announced plans to upload the LRT's assets to the province, while the NDP promised a 50/50 cost sharing program for municipal transit operations. While not guaranteed, the second item has a good chance of going ahead; the first will depend on the whims of the maybe-Poilievre government. 

Both of these represent changes in how OC Transpo could be funded.